NEW ASSEMBLY PLANT

Ref1.jpg

PROJECT PROFILE

  • Investment: 80 Mio. Euro (excl. IT)

  • Production area: 41.000 m² 

  • Innovative technologies: hydraulic test bench, surface coating facility, AGV assembly line, wheel assembly, in-line test benches

  • 2.5 months after start up to 95% utilization

Project Status: implemented

TRIAHEAD SERVICES

  • General project management

  • Subproject management (planning and implementation) of logistics, migration, IT data management, etc. 

NEW ASSEMBLY PLANT

P3.jpg

 

PROJECT PROFILE

  • Investment: 75 Mio. Euro

  • Production area: 42.000 m²

  • New Technologies: Hydraulic testing, paint shop, worker conveyor belts, in-line test stands, etc.
     

Project Status: Implemented

TRIAHEAD SERVICES

  • Potential analysis „Brownfield“ vs. „Greenfield“

  • Total factory site planning

NEW ASSEMBLY PLANT

PROJECT PROFILE

  • Investment Assembly: 75 Mio. Euro

  • Production Area: 42.000 m²

  • New Technologies: 

    • Hydraulic test bench 

    • Paint shop/surface coating facility

    • Flat conveyors for assembly staff

    • In-Line test benches, etc.

 

  • Customer center: 2,400 m², showroom, catering, museum

 


TRIAHEAD SERVICES
 

  • Total program management for implementation

  • Subproject managment logistics, assembly, technology, marketing

AGRICULTURAL TECHNOLOGY CUSTOMER CENTER AND MUSEUM

PROJECT PROFILE

  • Exhibition space: 1.500 m²

  • Museum- und Fan-Shop area: 900 m²

  • Concept planning of an exhibition and event hall: exhibition and event hall for product presentations, integration of a flexible utilization concept for marketing and sales (cinema, museum, fan shop, etc.) 
     

Project Status: implemented 

TRIAHEAD SERVICES

  • Benchmarking and Best Practice Analysis

  • Concept development and 3D visualization

  • General project management incl. execution

Ref11.jpg

NEW CABIN-ASSEMBLY

Ref2.jpg

PROJECT PROFILE

  • Investment: 40 Mio. Euro (excl. IT)

  • Production area: 17.000 m²

  • Innovative Technologies: Rrobot based adhesive processes, highly ergonomic AGV assembly line, highly automated production 

  • 2.5 months after start up to 95% utilization 

Project Status: implemented

TRIAHEAD SERVICES

  • General project management

  • Key subproject management of logistics, migration, IT data management, etc.

IMPLEMENTATION OF A CENTRAL CROSS-BRAND

PRODUCTION LOCATION

PROJECT PROFILE

  • Investment: 12,5 Mio. Euro

  • Production area: 18.500 m²

  • New Technologies: Llaser welding machines, laser cutting machines, automated bending, Laser tube cutting machines

  • Integration of new international products

Project Status: implemented

TRIAHEAD SERVICES

  • Planning and optimization of existing production areas for cabin and tractor attachments

  • Project management for the implementation of the technologies

Ref3.png

NEW ASSEMBLY PLANT

Ref10.jpg

PROJECT PROFILE

  • Investment: 15 Mio. Euro

  • Production area: 36.000 m²

Project Status: implemented (by customer)

TRIAHEAD SERVICES

  • concept development

  • Future workshops and definition of BRAND VISION 

  • Process re-engineering of all assembly & logistics processes: optimization of direct deliveries, definition of sequenced part category, implementation of supermarkets, definition of new supply concepts, planning of the logistics building as well as processes of the incoming goods department

ASSEMBLY PLANT RE-ENGINEERING

PROJECT PROFILE

  • Investment: confidential

  • Production area: 50.000 m²

  • Concept planning and potential analysis Re-engineering of a production plant: Re-design assembly processes, re-design logistics processes, re-design of quality management, identification of optimization potential, determination of personnel requirements, definition of new technologies (test benches, assembly line conveyor technology), carrying out a profitability analysis
     

 

TRIAHEAD SERVICES

  • Concept development

  • Future Workshops  

Ref6.jpg

RE-ENGINEERING Central Spare Parts -Distribution CENTER

Ref7.jpg

PROJECT PROFILE

  • Warehouse- and logistics surface: 42.000 m²

  • Re-engineering of logistics concept for a centralized spare parts distribution center with 250.000 part numbers

  • Dimensioning of all logstics surfaces

  • Ensuring SAP process conformity according to group standards

  • Segmentation of warehouse areas and preparation to part number increase by +50%

 

TRIAHEAD SERVICES

  • Inventory analysis

  • Process re-egnieering of all warehouse and picking processes

  • evaluation of investment and running cost p.a.

  • 3D warehouse planning

AGRITECHOTEL

PROJECT-PROFILE

  • Investment: 2,7 Mio. Euro

  • Hotel surface under roof: 1.500 m²

Project Status: postponed

TRIAHEAD SERVICES

  • Concept planning of building and exterior surfaces

  • several 3D design studies

  • Investment calculation

  • Review planning with general contractors for civil works, evaluation of offers